Project Summary
This project situated in Yeovil, Somerset involved careful removal of the existing decorative balustrade, which was then hot dip galvanized to be re-fitted according to structural drawings. Removal of the existing walkway supply and install a new external walkway. Re-routing of gas pipes and reconnect gas supply.